Solar Installation Timeline in California
How long does it take to install solar panels in California? Timelines vary by city due to local permitting processes and utility interconnection requirements. Select your city below for a detailed breakdown.
Cities in California
Select your city for a detailed installation timeline including local permit processing times and utility interconnection estimates.
Los Angeles
33¢/kWh · 5.6h sun/day
Avg bill: $260/mo · Los Angeles Department of Water and Power (LADWP)
San Francisco
34.5¢/kWh · 5.1h sun/day
Avg bill: $240/mo · Pacific Gas & Electric (PG&E)
San Diego
38¢/kWh · 5.7h sun/day
Avg bill: $280/mo · San Diego Gas & Electric (SDG&E)
San Jose
34¢/kWh · 5.4h sun/day
Avg bill: $255/mo · Pacific Gas & Electric (PG&E)
Sacramento
28¢/kWh · 5.8h sun/day
Avg bill: $230/mo · Sacramento Municipal Utility District (SMUD)
Fresno
32¢/kWh · 6h sun/day
Avg bill: $245/mo · Pacific Gas & Electric (PG&E)
Long Beach
30.5¢/kWh · 5.5h sun/day
Avg bill: $235/mo · Southern California Edison (SCE)
Oakland
34¢/kWh · 5.2h sun/day
Avg bill: $245/mo · Pacific Gas & Electric (PG&E)
More Solar Resources for California
Go Solar Faster in California
Our team manages permits, design, and installation so your California solar project stays on schedule. Get a free quote today.
Get Your Free Quote